• Facebook
  • Google+
  • LinkedIn

Dam Analysis & Repair


Tomlinson-Mill Dam, NJ Dam #31-87

Township of Evesham, Burlington County, NJ – CES preformed an analysis to determine existing runoff, inundation mapping, and appropriate spillway design storm.  The project included preparation of inundation maps suitable for inclusion to the dam’s Emergency Action Plan, and performing bathymetric cross sections of each existing pond to estimate storage volumes of the reservoir’s NJDEP/Dam […]

Read More....

Cumberland County Multiple Dam Inspections

Dam structures undergo routine inspections as required by the State of New Jersey. CES was chosen by Cumberland County to provide Formal Inspection Reports for several County-owned dams. These studies included inspection of existing bank slopes and crests, surface erosion, vegetative intrusion, and review of abutments, spillway structures, and exit channel conditions. Most dams are […]

Read More....

Wadsworth Lake Dam Removal Permit

Washington Township, Gloucester County, NJ – CES provided engineering services to prepare a New Jersey Dam Safety Permit Application and supporting documents for the removal (breach) of the Wadsworth Dam, currently listed with the NJDEP Dam Safety Section as an ‘unsafe’ high hazard dam. A previously prepared Hydrologic Analysis for upstream Kandle Lake Dam was […]

Read More....

Shaws Mill Pond Dam

Read More....

Kandle Lake Dam

 

Read More....

Burnt Mill Pond Dam – Design and CM

 

Read More....

Memorial Park Dam

Read More....