Tomlinson-Mill Dam, NJ Dam #31-87
Township of Evesham, Burlington County, NJ – CES preformed an analysis to determine existing runoff, inundation mapping, and appropriate spillway design storm. The project included preparation of inundation maps suitable for inclusion to the dam’s Emergency Action Plan, and performing bathymetric cross sections of each existing pond to estimate storage volumes of the reservoir’s NJDEP/Dam Safety Flood Control (DSFC) coordination. CES coordinated initial versions of the H&H analysis through NJDEP/DSFC for confirmation of completeness and adequateness of the study and reports, and all review comments were addressed for final NJDEP approval. CES also developed an Operation and Maintenance Manual for the dam.